- Details
Pipe robot family ready for the construction of a new nuclear power station in Olkiluoto, Finland. The third block of the Olkiluoto nuclear power station is under construction on the island of Okiluioto in the Gulf of Bothnia on the west coast of Finland. As the project leader, AREVA NP together with Siemens will hand over the turnkey European Pressurised Reactors (EPR) with an output of 1600 MW to TVO.
- Details
Adelholzener Alpenquellen GmbH is the largest mineral spring in Bavaria, based in Bad Adelholzen, a district of Siegsdorf. Around 400 million bottles of the brands Adelholzener and Active O2 are filled annually by the around 385 employees.
- Details
At a large eastern German chemistry plant last year various steel and stainless steel pipelines with an internal diameter of 150 and 600 mm were visually inspected and the current wall thickness of the pipes determined. The plant produces intermediate products made of plastic.
- Details
At its site in Stade, Aluminium Oxid Stade GmbH produces a highly pure aluminium oxide which is in demand throughout the world. The production capacity is approx. 1,050,000 tonnes per year. The modern production facilities and constant optimisation of the production processes require the latest technology and qualified personnel.
- Details
Ultrasonic inspection robot checks district heating pipe under a side arm of the Maas. One hundret metres in length and 8 inches in diameter – these are the key data for an inspection project in the Netherlands.